Wind farm Viru-Nigula, Estonia, 24 MW

The wind farm “Viru-Nigula” is located at the northern coast of Estonia, some 125 km east of Tallinn. The distance to the sea border is around 7 km and the height above sea level is around 60 m.

The project development started in 2004 with a wind measurement, the planning- and permission phase was finished in autumn 2005.

The building works started in 2006, since late 2007 the wind farm is in operation. A total number of 8 turbines of type WinWind WWD-3 with a total capacity of 24 MW is connected through its own substation to the national grid.

Karte des Windparks Viru-Nigula, Estland, der Intercon Energy

Main data of the wind farm:

Projected power output: 24 MW
Number of units: 8 units of type WinWind WWD-3 with 3 MW
Average wind speed: 6.7 m/s
Yearly energy yield: 59.000.000 kWh/a
Investment costs: 25.600.000 €
Specific investment costs: 1.070.000 €/MW
~0,437 €/kWh
Start of operation:

Start of operation: end of 2005

Sorry, but the project is sold! Access for investors closed.

Wind farm Vanaküla, Estonia, 9 MW

The wind farm „Vanaküla“ is located at the west coast of Estonia approx. 80 km southwest of Tallinn at a distance of 2 km to the sea border.

The development of the wind farm started in 2006 with a wind measurement, followed by planning- and permission phase. Together with a neighboured wind farm a joint substation was planned and erected. The building works started in 2008 and were finished in 2009 with the operation of the wind farm.

 

pro2

Main data of the wind farm:

Projected power output: 9 MW
Number of units: 3 units of type WinWind WWD-3 with 3 MW
Average wind speed: 7,2 m/s at 100 m hub height
Yearly energy yield: 25.000 MWh
Investment costs: 11.650.000 €
Start of operation:

2009

The project is closed for investors.

We started the construction works in spring 2008.